In WA electrical work can only be done by people licensed by the Electrical Licensing Board, under the Electricity (Licensing) Regulations 1991. Building and Energy is the regulator. Licensed electrical contractors must employ licensed electricians to do the work, and the contractor owes you an electrical safety certificate within 28 days.
| Regulator | Building and Energy (Department of Local Government, Industry Regulation and Safety), with the Electrical Licensing Board |
|---|---|
| Official licence check | WA Online Licence Search |
| Certificate after the job | Electrical safety certificate |
| Certificate rule | Given to the person the work was done for within 28 days of completion |
| Listings on this site | None. No reusable bulk register file. Why |
Who is in charge
Names have shifted in the west. Electrical licensing is run by Building and Energy, which now sits inside the Department of Local Government, Industry Regulation and Safety. Licences themselves are granted by the Electrical Licensing Board. The licensing page covers electricians' licences, restricted licences, training licences and permits, the electrical contractor's licence, and a separate in-house electrical installing work licence.
Electrical work here means work on anything supplied at more than 50 volts AC or 120 volts DC, "whether they're connected to the power supply or not".
The contractor and the nominee
A contractor's licence depends on a nominee, a named person who carries the technical responsibility. Building and Energy's FAQ for licence holders spells out what happens when that person walks: the contractor's licence is suspended if the company has no other nominee, and stays suspended until a new one is appointed. No notifiable electrical work can be carried out without a nominee.
For a customer mid-renovation that matters. If your contractor loses its nominee, another electrical contractor has to finish the work and submit the notices and the certificate.
Two bits of paperwork, two deadlines
WA is strict on notices, and the deadlines are different for each document.
| Document | Goes to | Deadline |
|---|---|---|
| Notice of Completion | The network operator, lodged through eNotice | Three days after the work is complete |
| Electrical safety certificate | The person the work was done for | 28 days after completion |
The three day rule comes from regulation 52(1) and the FAQ's wording is "no exceptions". The certificate rule is regulation 52B. The certificate is not required for maintenance work, and the contractor must keep a copy for at least five years.
Two RCDs before you sell or lease
WA requires at least two RCDs protecting power point and lighting circuits before a home's title is transferred, and in rental premises. Details are in safety switch and RCD rules.
Test and tag is separate
One WA quirk: testing and tagging portable equipment falls under workplace safety law, and the person doing it does not need an electrician's licence. They need to be a licensed electrician or a competent person with nationally recognised training. A test and tag operator cannot rewire your shed.
Why Western Australia has no listings here
We searched the state's open data catalogue and found network asset maps, but no electrical licence file. The licence search works one number at a time and does not publish business names. No bulk source, so no listings.
Checking a licence in Western Australia
The official check is WA Online Licence Search. Our step by step for WA is on the check a licence page.
Questions about WA electrical licensing
Can I search the WA licence register by business name?
The WA Online Licence Search verifies a record by number and works on exact matches including the prefix. Building and Energy states that it does not publish business or trading names.
How long does a WA electrical contractor have to give me a safety certificate?
Within 28 days of completing the electrical installing work, under regulation 52B of the Electricity (Licensing) Regulations 1991. Maintenance work is exempt.
What happens if a WA electrical contractor's nominee leaves?
If the contractor has no other nominee, the licence is suspended until a new nominee is appointed, and no notifiable electrical work can be carried out in the meantime.
Sources
- Electrical licensing, Government of Western Australia. Read November 2026.
- FAQs for electrical licence holders, Government of Western Australia. Read November 2026.
- Electrical technical guidance, Government of Western Australia. Read November 2026.
- WA Online Licence Search, Government of Western Australia. Read November 2026.