Electrician licensing in Victoria
Victoria runs two layers. Energy Safe Victoria licenses the person (most commonly an A Grade electrician) and separately registers the business as a Registered Electrical Contractor, or REC. An electrician must work for a REC to do a job for a customer, and each job ends with a Certificate of Electrical Safety.
| Regulator | Energy Safe Victoria |
|---|---|
| Official licence check | Energy Safe Victoria public registers |
| Certificate after the job | Certificate of Electrical Safety (COES) |
| Certificate rule | Non-prescribed work: your copy within 30 days. Prescribed work: inspected first |
| Listings on this site | None. No reusable bulk register file. Why |
Person and business are checked separately
Energy Safe Victoria's licence list is long. It includes the Electrician's licence (A Grade), the Restricted Electrical Worker's licence, supervised worker licences, the Licensed Electrical Inspector licence, plus lineworker and switchgear licences. For a household job only two of them matter much.
The A Grade licence belongs to the tradie. The REC registration belongs to the business. Energy Safe's own definition is that an electrician "must work for a Registered Electrical Contractor to perform work for a customer". A solo sparky can be both at once.
What a REC has to have
A REC can be an individual, a partnership or a company. Each one needs a technical supervisor and a business supervisor in place, and the technical supervisor must hold a current Victorian A Grade licence. Registration can be renewed for up to five years at a time. Public liability insurance is part of the registration requirements.
The COES, and why some jobs need an inspector
Every piece of electrical installation work in Victoria ends in a COES, a legal document required by the Electricity Safety Act 1998 and the Electricity Safety (General) Regulations 2019. There are two kinds.
Prescribed work is the heavy end: consumer mains, the main switchboard, the meter box, the main earthing system, generators, solar and batteries. An independent Licensed Electrical Inspector must inspect it, your REC organises that, and the work "cannot be turned on or left turned on until it has been inspected". Energy Safe says the inspection should happen within 8 business days of the work finishing, and you get your copy within 4 days of the certificate being completed.
Non-prescribed work covers lights, power points, air conditioning and hot water. No inspector. The sparky tests, certifies, leaves it on and gets you a copy within 30 days.
One line worth remembering from Energy Safe: check that the inspector who signs the certificate actually came to your property.
Lost your certificate
Energy Safe can search for electronic certificates raised since July 2019 and runs that search at no fee. The detail is in our guide to certificates of electrical safety.
Why Victoria has no listings here
Energy Safe publishes its REC register as a search tool behind a CAPTCHA, and the DataVic catalogue entry points to that same tool with no file to download. We do not scrape search forms, so this page explains the system and sends you to the official register.
Checking a licence in Victoria
The official check is Energy Safe Victoria public registers. Our step by step for VIC is on the check a licence page.
Questions about VIC electrical licensing
What is a REC in Victoria?
A Registered Electrical Contractor is a business, person or company registered with Energy Safe Victoria to contract for electrical installation work. Individuals, partnerships and companies can register, and each needs a technical supervisor and a business supervisor.
Which electrical jobs in Victoria need an independent inspection?
Prescribed work. Energy Safe Victoria's examples include consumer mains cables, the main switchboard, the meter box, the main earthing system, motor generators, solar systems and battery storage. A Licensed Electrical Inspector must inspect it before it is turned on.
How long does a Victorian sparky have to give me a COES for a new power point?
A power point is non-prescribed work. The Registered Electrical Contractor or licensed worker must give you a copy of the certificate within 30 days.
Sources
- Licence types, Energy Safe Victoria. Read November 2026.
- Certificates of Electrical Safety for the community, Energy Safe Victoria. Read November 2026.
- Registered Electrical Contractors (REC), Energy Safe Victoria. Read November 2026.
- Registered Electrical Contractor (REC) listing: catalogue entry, DataVic. Read November 2026.